Our clients are major states and private companies such as:
- Ministry of Industry & Minerals Companies
- Ministry of Oil Companies (Such as Refineries)
- Ministry of Electricity
- Other State Companies
- Private Companies
 |
| Water intake for Al-Qudos Power Station - Baghdad |
Sidcco has served the above sectors for more than 15 years as indicated in the following major projects.
| Water Treatment & others |
| No |
Project Name |
Location |
Activities |
| 1 |
Reverse osmosis unit 85 m3/hr of permeate water (including pre-treatment section) for Nassiriya Power Station (Phase 1). |
Nassiriya |
Study, Design, Construction, and Commissioning. |
| 2 |
Reverse osmosis unit 64 m3/hr of permeate water (Including pre-treatment section) for Nassiriya Power Station. (Phase 2). |
Nassiriya |
Study, Design, Construction, and Commissioning. |
| 3 |
Chilled water system for chlorine unit at Petrochemical complex no1. |
Basrah |
Design, Construction, and Commissioning. |
| 4 |
Water treatment unit 200 m3/hr of drinking water for Alwafa project. |
Tuzkhormato City |
Study, Design, and Supervision during construction and commissioning. |
| 5 |
Rehabilitation of Boilers unit for Basrah Paper Mill Plant. |
Basrah |
Study the overall water balance for the plant followed by rehabilitation works of boilers. |
| 6 |
Execution of water pipeline (17km) of 85 m3/hr of drinking water to free zone by using 225mm of HDPE pipes (including pump station). |
Basrah |
Study and design of the rout pipeline system, supply pumps and material, construction, and commissioning. |
| 7 |
Execution of water pipeline (12 km) to the Kubbaisa Cement Plant by using 300mm of ductile pipes. |
Kubbaisa |
Study and design of the rout pipeline system, supply material, construction, and commissioning. |
| 8 |
Extruder building power & utilities at plastic factory. |
Baghdad |
Detailed Engineering and supervision during construction |
| 9 |
Design of utilities supply system for workshops of Al-Faris Co. |
Baghdad |
Design basic and detailed Engineering |
| 10 |
Fire water system at petrochemical complex no1. |
Basrah |
Construction |
| 11 |
Ethylene unit under grown cooling water risers at petrochemical complex no1. |
Basrah |
Design and Fabrication |
| 12 |
Plastic pen building utilities |
Baghdad |
Detailed Eng. and supervision during construction and commissioning |
| 13 |
Electrical boilers for Interior Ministry |
Baghdad |
Rehabilitation |
| 14 |
Softener ( 2 * 2.2 m3/hr ) for Interior Ministry |
Baghdad |
Supplying installation start-up |
| 15 |
Water intake for Al-Qadisia power plant |
Baghdad |
Construction |
| I. Oil Industry (Ministry of Oil) |
| No |
Project Name |
Location |
Activities |
| 1 |
Rehabilitation of linear Benzene plant |
Beij |
Reconstruction |
| 2 |
Rehabilitation of Kerosene hydro-treating unit |
Dora |
Reconstruction |
| 3 |
Needle coke production unit |
Qayarah |
Design and construction |
| 4 |
Isomerization unit |
Dora |
Detailed Eng |
| 5 |
13000 BPSD process unit revamp to crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 6 |
13000 BPSD crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 7 |
13000 BPSD Crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 8 |
50000 BPSD process unit revamp to crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 9 |
50000 BPSD process unit revamp to crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 10 |
10000 BPSD process unit revamp to crude unit |
Kirkuk |
Design, construction, supervision,
start up
|
| 11 |
Wet crude desalting & dehydration |
Kirkuk |
Basic & Detailed Eng |
| 12 |
Mixed Xylenes units |
Beiji |
Design, equipment
supply, construction start up
|
| 13 |
Xylenes separation unit |
Beiji |
Basic & Detail Eng |
| 14 |
10000 BPSD small Refinery |
Beiji |
Design construction start up |
| 15 |
10000 BPSD small Refinery |
Beiji |
Design construction start up |
| 16 |
5 small Refineries 10000 BPSD |
Ministry of Oil |
Design , supply of equipment |
| 17 |
4 Oil tanks |
Basrah |
Rehabitation & maintenance |
| 18 |
8 LPG tanks |
Ashtar Com. |
Inspection & maintenance |
| I. Power Plants (Ministry of Electricity) |
| No |
Project Name |
Location |
Activities |
| 1 |
Water treatment unit for Nassiriya power station |
Nassiriya |
Design, Construction, Start up |
| 2 |
Rehabilitation of Beiji power station |
Beiji |
Activity management |
| 3 |
Large IDP pumps operation for Beiji power station |
Beiji |
Start up |
| 4 |
Participation and construction of a treatment plant for Beiji power station |
Beiji |
Construction |
| 5 |
Hydrogen production – unit 64 m3/hr for Beiji power plant |
Beiji |
Design, Construction, Start up |
| 6 |
Rehabilitation of Musseib power station hydrogen unit |
Al-Musseib |
Rehabilitation, Start up |
| 7 |
Modification of Nitrogen production unit for Al-Musseib power station. |
Musseib |
Rehabilitation, Start up |
| II. Industry (Ministry of Industry and Minerals) |
| No |
Project Name |
Location |
Activities |
| 1 |
Completion of resin plants (Polyester, Alkyd, PVA phenol formal dehydration, utilities). |
Taji |
Construction |
| 2 |
Implementation of FRP facility |
Taji |
Design, Construction |
| 3 |
Urea covered with sulphur unit |
Beiji |
Construction, Start up |
| 4 |
Application laboratories equipment rehabilitation |
Musseib |
Rehabilitation |
| 5 |
Completion of glass fiber plant |
Taji |
Construction |
| 6 |
Dismantling & re-installation of two crackers |
Basrah |
Construction |
| 7 |
Ten cracking furnace |
PC2 / Musseib |
Construction |
| 8 |
Brake fluid Unit |
Taij |
Design, Construction |
| 9 |
Methanol plant |
Beiji |
Detailed Eng., Construction |
| 10 |
Sodium sulphate unit modification |
Samarah |
Detailed eng. and construction supervision |
| 11 |
Rehabilitation of PC1 (150000T/Y) |
Basrah |
Supervision |
| 12 |
150000 T/Y sodium carbonate plant with utilities |
Baghdad |
Detailed Eng., Construction |
| 13 |
Chlorine compressor (Chlorine Unit) |
PC1 Basrah |
Installation |
| 14 |
Soduim phosphate |
Al-Kaem |
Design, Construction, Start up |
| 15 |
Rehabilitation of electrical & control system for Al-Furat chlorine plant |
Al-Musseib |
Rehabilitation, Start up |
| 16 |
H2SO4 plant modification |
Mishrak |
Detailed Engineering |
| 17 |
Basic and detail engineering of ethylene plant in PC1 for liquid and gas feed stocks to produce propylene with ethylene |
Basrah PC1 |
Basic and detail engineering |
| 18 |
Basic & detailed design for upgrading of furfural production unit / in paper mill plant |
Basrah |
Design, Start up |
| 19 |
Printing ink unit 500 KG/shift |
Baghdad |
Design, Construction, Start up |
| 20 |
Ethanol unit 10000 T/Y |
Mosul |
Design, Start up |
| 21 |
LLDPE double pipe exchangers |
PC1 Basrah |
Prefabrication |
| 22 |
Popcorn threshing & drying |
Azizia |
Design utilities construction |
| Civil Works |
| No |
Project Name |
Location |
Activities |
| 1 |
Buildings for soda ash project such as: (engineering building, control building, main substation building, restaurant building and workshop building) |
Baghdad |
Design and construction |
| 2 |
Rehabilitation of production and administration buildings stores. At oil factory in Missan |
Missan |
Rehabilitation |
| 3 |
Rehabilitation of stores, workshop, maintenance, administration building, safety and inspection building at Abu Al-Khasib fertilizer project |
Basrah |
Rehabilitation |
| 4 |
Application laboratories building |
Baghdad |
Construction |
| Technical Inspection (Monitoring) Carried – Out Since 1990 |
| No |
Project Name |
Location |
Activities |
| 1 |
PC2/ Cracking heaters SRTI & 3 |
Al-Musseb |
Inspection
of all the convection Soc. All N.D.T. test & P.W.H.T.
|
| 2 |
Resin plant (Polyester, Alkyd & PVA) |
Taji |
Inspection
of all N.D.T. test, & P.W.H.T. for piping system and equipment
|
| 3 |
Linear Alkyd Benzene Complex |
Beiji |
Inspection
of Radiograph & Hydrostatic test for piping system + stress relieve for equipment reapers
|
| 4 |
Kerosene Hydro-treating Unit |
Dora |
Inspection
of N.D.T test + Hydrostatic test for piping system + equipment
|
| 5 |
Mausseib power station |
Al-musseb |
Inspection of (4) steam boilers
* Radiograph & Hydrostatic test
|
| 6 |
Sulphuric acid plant (H2So4 plant) |
Al-Kaem |
Inspection
of N.D.T & Hydrostatic test for piping system
|
| 7 |
Paper mill plant |
Basrah |
Inspection of * N.D.T + D.P. test for welding joints & Hydrostatic test
|
| 8 |
PC1 |
Basrah |
Inspection of (4) steam boilers
* N.D.T + D.P. test for welding joints & Hydrostatic test
|
| 9 |
Dora power station |
Beij |
Inspection of (4) steam boilers
* N.D.T + D.P. test for welding joints & Hydrostatic test
|
| 10 |
Mixed Xylenes * Xylene separation units |
Beiji |
Inspection
of N.D.T + PWHT for piping system& equipment
|
| 11 |
Isomerization unit |
Dora |
Inspection of
N.D.T + PWHT for piping & equipment
|
| 12 |
13000-units BPSD crude |
Kirkuk |
Inspection of (3) units
N.D.T + Radiograph & Hydrostatic test for piping & equipment
|
| 13 |
50000 BPSD process unit revamp to crude unit |
Kirkuk |
Inspection of (2) units
N.D.T + PWHT for piping system & equipment
|
| 14 |
Small refineries 10000 BPSD |
Beiji |
Inspection of (5) units
* Radiograph & Hydrostatic test for piping & equipment
|
|